Featured image of article: Solar Panel Project Proceeds In Parallel With Heating Unit Work

Solar Panel Project Proceeds In Parallel With Heating Unit Work

As part of the continued work on the solar panel array atop ConVal Regional High School, contractors are accessing the roof in two different locations.

One access ladder has been set up just to the left of the loading dock in the back of the school and another ladder is set up on the “Void” side of the link.

On Thursday, a crane lifted equipment on the roof in the 200 section of the classrooms to get everything ready for further work next week, when the installation of the solar system will proceed in parallel with the fitting of new heating coils that will service classrooms in the 100 section of the building.